Via WFB:

The State Department has undertaken the costly construction of new embassies across the globe.

The new embassy in London is estimated to cost around $1 billion. Glass for the London build was shipped back and forth across the Atlantic Ocean for cutting and framing. The new Afghanistan embassy exceeded $150 million.

The current embassy in Mexico City is currently crumbling, unsafe, and overcrowded. The build was supposed to cost $600 million but has increased at least a third, all before the start of construction. The new site for the embassy was bought four years ago for $120 million and was in a former industry area that was once site to a Colgate Palmolive factory that left hazardous waste.

Keep reading…

4 Shares